In 20+ years we have become the largest power & water developer in the GCC region, and a name to contend with internationally.
The Khalladi wind farm is a 120 MW onshore wind power project located in the Tanger-Tetouan-Al Hoceima region of Morocco. The wind farm consists of 40 turbines and is designed to supply electricity to large industrial customers connected to the high-voltage grid.
Project Description: Arabic, French (Annex (Arabic), Annex (French))
Non-Technical Summary: Arabic, English, French
Stakeholder Engagement Plan: Arabic, French (Annex (Arabic), Annex (French))
Social Impact Assessment: Arabic, French
Biodiversity Protection Plan: Arabic, French (Annex (Arabic), Annex (French), Power Line Alignment Habitats Map (French), Wind Farm Cumulative Final Map (French), Wind Farm Habitat Driven Map (French))
Land Acquisition Review and Livelihood Restoration Framework: Arabic, French
Environmental & Social Management & Monitoring Framework: Arabic, French
Noise Impact Assessment: Arabic, French (Drawing No. 1 (Windless Condition), Drawing No. 2 (Main Wind Condition))
Flicker Effect Assessment: Arabic, French (Drawing No. 1 (Shadow Flicker Effect))
Environmental & Social Action Plan: Arabic, English, French
Cahier des Charges (French)
Khalladi EIS Approved (French)
Khalladi EIS Annexes (French)
Go Back