Red Sea Global Project

OVERVIEW

ACWA Power Consortium and Red Sea Global have signed a 25-year Utilities Concession Agreement with a total investment value of US$1.5 billion for the development/construction/operation of a multi-utilities Project. TRSDC, via its affiliate, acts as the sole off-taker.


The destination is located in Saudi Arabia Red Sea coast between the localities of Umluj and Al Wajh and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operations, and maintenance of the plants delivering power from renewable sources, water, treating wastewater, providing cooling via district plants, and handling the municipal solid waste with no landfill at the site.


Worth noting, the energy will be generated via solar panels and the largest BESS plant for captive use (around 1.200 GWh) to meet the initial demand of TRSDC with the ability to expand in line with the development. This largest battery storage facility will allow the destination to remain completely off-grid and powered by renewables day and night.

KEY FACTS

  • LOCATION
    Umluj Area, Red Sea Coast, KSA
  • OFFTAKER
    Red Sea Global
  • POWER
    PV: 340 MWac, BESS : 1,200 MWh, Internal Combustion Engine: 108.98 MW. Water: RO: 32,500 m3/day, Waste Water: 18,315 m3/day. District Cooling: 32’500 RT, MSW : 11,775 T/year
  • ACWA POWER SHARE
    50%
  • OFFTAKE CONTRACT
    25-year UCA
  • PROJECT COMPANY
    MARAFIQ RED SEA FOR ENERGY COMPANY