Shuaibah PV IPP

OVERVIEW

Al Shuaibah 1 and Al Shuaibah 2 Solar PV Independent Power Plant, Jeddah, KSA. which is comprise of two PV Plants for 35 years. The two Sites are located in Shuaibah, approximately 80 km south of the city of Jeddah, in Makkah Province

The two PV Plants are:

  1. Al Shuaibah 1 (ASB1 Plant) 600 MWac
  2. Al Shuaibah 2 (ASB2 Plant) 2060 MWac

The technology adopted is N-type bi-facial Monocrystalline silicon Modules. The contractor is CEEC JV, Offtaker SPPC/Principal buyer, Operator  Nomac. 

 

https://acwapower.egnyte.com/dl/YfjSsTLNU1/Appendix_2_AFA_Part_III_Annex_1.6_ESIA_Study_18Jul2019_R00.pdf_ 

 

https://acwapower.egnyte.com/dl/LR1YGPwpuV/Shuaibah_PV_ESIA_Addendum_v2.0-compressed.pdf_ 

 

KEY FACTS

  • LOCATION
    Al-Shuaibah, Makkah Province, KSA
  • OFFTAKER
    Principal Buyer | Saudi Power Procurement Company (SPPC)
  • POWER
    ASB1 – 600 MW AC, ASB2 – 2060 MW AC
  • TECHNOLOGY
    N-type bi-facial Monocrystalline Silicon Modules
  • PROJECT COST
    2.37 BUSD
  • ACWA POWER SHARE
    35.01%
  • COMMERCIAL OPERATIONAL DATE
    ASB1: 28 February 2025 ASB2: 30 November 2025
  • OFFTAKE CONTRACT
    PPA BOO 35 years
  • PROJECT COMPANY
    Shuaibah Holding Company (SHC)