Our integrated Health, Safety & Environmental management system meet IFC’s guidelines

HSSE Management

SHARE THISSHARE THIS

Our integrated Health, Safety, Security and Environmental (HSSE) management system meet IFC’s stringent guidelines. We believe we are leading HSSE improvement and enabling culture change in several of the locations in which we invest and operate, based on our ongoing international benchmarking activities and activate coaching of local teams.

During the feasibility assessment and development or acquisition phases for new assets, HSSE issues are identified and managed by undertaking HSSE due diligence assessments and then commissioning environmental & social impact assessments (ESIA) that are completed by independent consultants.

Asset performance-related and technical issues with HSSE consequences are covered by ACWA Power’s minimum technical specifications which are applied to all projects and are based on ensuring compliance with local legislation and the WB/IFC EHS Guidelines.

At the start of construction, project-specific HSSE and social action plans are established as part of the implementation of the ESIA which is also a contractual obligation. ESIA compliance is monitored by both the project company’s and the corporate HSSE teams, who are supported by independent environmental consultants that conduct audits on the lenders’ behalf.

At an operational level, NOMAC has an integrated management system that covers HSSE and has been certified to the ISO and OHSAS standards since 2010. We perform an annual occupational health check-up for at risk operational employees covering a range of parameters, including lung tests and audio tests. All construction sites have access to on-site nurses and doctors, with remote sites having on-site ambulances and emergency response resources.

ACWA Power offers rewards programs to motivate stakeholders to abide by the company’s HSSE policies. They include recognition, bonuses and cash incentives for good performance and rewarding reporting of near-misses. We believe that incentives combined with a zero-tolerance enforcement of standards are instrumental in driving HSSE in action and fostering a safety culture across all of ACWA Power.

Emergency and critical health and safety incidents are reported through agreed channels within four hours to enable the deployment of formal emergency response plans. All incidents are followed up through formal investigations to identify root causes and lessons learned, the outcomes of which are shared. Incidents and noncompliance events are reported monthly and collated for publication in ACWA Power’s annual corporate report. We conduct periodic management and performance audits which are followed by a detailed report of findings, conclusions and recommendations. These are then monitored and tracked until closure.

Environmental and Social Impact Studies

  • member-image

    Al Dur2 IWPP ESIA

    • Environmental & Social Impact Assessment, Volume 1 (English)

    • Environmental and Social Impact Assessment Volume 2 (English) 

    • Environmental & Social Impact Assessment Volume 3 (English) 

    • Environmental and Social Impact Assessment Volume 4 (English)

  • member-image

    Al Taweelah IWP

    • Environmental & Social Impact Assessment, Volume 1 (English)

    • Environmental and Social Impact Assessment Volume 2 (English) 

    • Environmental & Social Impact Assessment Volume 3 (English) 

    • Environmental and Social Impact Assessment Volume 4 (English)

    • Non-Technical Summary (Arabic)

    • Stakeholder Engagement Plan (English) 

  • member-image

    Ibri 2 IPP

    Ibri II Environmental & Social Impact Assessment: Non-Technical Summary (Arabic) (English)

    Ibri II Resettlement Action Plan (English)

    Ibri II Stakeholder Engagement Plan (English)

    Ibri II Environmental & Social Impact Assessment Vol 2: Main Text, Tables & Figures (English)

    Ibri II Environmental & Social Impact Assessment Vol 3: Environmental Management & Monitoring Plan (English)

    Ibri II Environmental & Social Impact Assessment Vol 4: Techincal Appendices (English)

  • member-image

    Khalladi Wind IPP ESIA Disclosure Package

  • member-image

    Environmental Impact Assessment (EIA)

    Hard copies of the Khalladi Wind Farm ESIA Disclosure Package and Khalladi Environmental Impage Assessment are also available at the “bureau d’ordres” at the following municipalities: 

    Qsar Sghir: Commune Ksar Sghir, Préfecture Fahs Anjra, Wilaya de Tanger. 
    Meloussa: Commune Meloussa, Préfecture Fahs Anjra, Wilaya de Tanger. 
    Khmis Anjra: Commune Fahs ANJRA, Préfecture Fahs Anjra, Wilaya de Tanger. 
    Souk Kdim: Commune Souk Kdim, Province Tetouan 
    Sadina: Commune Sadina, Province Tetouan

  • member-image

    Salalah IWP ESIA

    • Environmental & Social Impact Assessment, Volume 1: Non Technical Summary (NTS) (English) (Arabic)

    • Environmental and Social Impact Assessment Volume 2 (Main Text, Tables & Figures) (English) 

    • Environmental & Social Impact Assessment Volume 3: (Framework Environmental & Social Management Plan (ESMP)) (English) 

    • Environmental and Social Impact Assessment Volume 4 (Appendices) (English)

  • member-image

    Umm Al Quwain IWP

    • UAQ 150 MIGD Environmental Approval (English) (Arabic)
    • Environmental & Social Impact Assessment Volume 1: Non-Technical Summary (English) (Arabic)

    • Environmental and Social Impact Assessment Volume 2: Main Text (English

    • Environmental & Social Impact Assessment Volume 3: Environmental & Social Management (English

    • Environmental and Social Impact Assessment Volume 4: Appendices (English)

    • Stakeholder Engagement Plan (English

Top