Al Dur Phase II IWPP

Al Dur Phase II IWPP

Al Dur2 IWPP is an Independent Water and Power Project located at Al Dur in the Kingdom of Bahrain. The Plant shall be developed to generate 1,500 MW of Power based on Combined Cycle Gas Turbine(CCGT) technology and produce 50 MIGD of water through Sea Water Reverse Osmosis (SWRO) technology. The plant shall be integrated with the existing Intake and Outfall facilities while the Gas Connection Facilities shall be developed and transferred to Tatweer to facilitate supply of Natural Gas to the Plant. The Plant is expected to be fully operational by Q2 2022.

Key documents

  • ESIA Volume I Non-Technical Summary

  • ESIA Volume II Main Report

  • ESIA Volume III Environmental Management & Monitoring

  • ESIA Volume IV Appendices

Key facts

  • Location

    Al Dur, Bahrain

  • Offtaker

    Electricity and Water Authority, Bahrain (EWA)

  • Power

    1,500 MW

  • Desalinated water (000' m3/day)

    227 m3/day

  • Fuel

    Natural Gas

  • Project cost

    US$ 1,100 million

  • Acwa share

    60%

  • Offtake contract

    PWPA-BOO 20 years

  • Other investors

    Mitsui (30%), Almoayyed Contracting Group WLL (10%)

  • Commercial operations date

    Q2 2022

  • Project company

    Haya Power & Desalination Company BSC

  • Operations & maintenance company

    Acwa Operations

  • Engineering, procurement & construction company

    Consortium of SEPCO III, Power China & Sidem