Kungrad 123 Wind IPP
The Kungrad 1,500MW Wind + 300MW BESS project, including a ~1,450km OHTL (to be handed over to the offtaker after construction) is a greenfield independent power project being developed by ACWA Power in the Republic of Karakalpakstan, Republic of Uzbekistan.
ACWA Power and JSC National Electrical Grid of Uzbekistan (NEGU) signed a 25-year Power Purchase Agreement (PPA) for the sole offtake of the plant’s electrical output.
The project will be located in the Republic of Karakalpakstan and developed under a ‘Build, Own, Operate & Transfer’ framework. ACWA Power will take the lead in the construction, engineering, operation and maintenance of the plant.
Key documents
Key facts
-
Location
Kungrad District, Republic of Karakalpakstan, Republic of Uzbekistan
-
Offtaker
JSC National Electric Grid of Uzbekistan (NEGU)
-
Capacity
1,500 MW Wind + 300MW BESS
-
Technology
Onshore Wind + BESS
-
Project cost
US$ 3,068.46 million
-
Acwa share
100%
-
Offtake contract
25-Yr PPA | BOO(T)
-
Project company
“ACWA POWER KUNGRAD WIND 1” LLC FE, “ACWA POWER KUNGRAD WIND 2” LLC FE, “ACWA POWER KUNGRAD WIND 3” LLC FE