Tashkent Riverside PV

Tashkent Riverside PV

The Riverside 200 MW PV + BESS project is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.

ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 200 MW photovoltaic plant including a battery energy storage system (“BESS”). JSC National Electric Grid of Uzbekistan acts as the sole off-taker.

The project will be located in the Tashkent region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.

Key documents

  • ESIA Volume I Non-Technical Summary

  • ESIA Volume II Main Report

  • ESIA Volume III Environmental & Social Monitoring

  • ESIA Volume IV Appendices

  • Stakeholder Engagement Plan

  • Land Acquisition Review and Livelihood Restoration

Key facts

  • Location

    Yuqori-Chirchiq, Tashkent Region, Uzbekistan

  • Offtaker

    JSC National Electric Grid of Uzbekistan (NEGU)

  • Capacity

    200 MW

  • Technology

    Solar PV technology, using bi-facial panels with tracking technology, and battery energy storage system

  • Project cost

    US$ 546 million

  • Acwa share

    100%

  • Offtake contract

    25-year PPA BOO(T)

  • Project company

    FE “ACWA Power Riverside Solar” LLC

  • Operations & maintenance company

    NOMAC