Bash Wind IPP
The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
Key documents
Key facts
-
Location
Bash, Bukhara Region, Uzbekistan
-
Offtaker
JSC National Electric Grid of Uzbekistan (NEGU)
-
Capacity
500 MW
-
Technology
Onshore Wind
-
Project cost
US$ 690 million
-
Acwa share
65%
-
Offtake contract
25-year PPA BOO(T)
-
Project company
FE “ACWA Power Bash Wind” LLC
-
Operations & maintenance company
NOMAC