Bash Wind IPP

Bash Wind IPP

The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.

ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.

The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.

Key documents

  • ESIA Volume I Non-Technical Summary

  • ESIA Volume II Main Report

  • ESIA Volume III Environmental & Social Management

  • ESIA Volume IV Appendices Part A

  • ESIA Volume IV Appendices Part B

  • Stakeholder Engagement Plan

  • Resettlement Action Plan

  • Summary of Material Updates to the ESIA Package

  • ESIA Consultation and Disclosure Report

  • ESIA Volume I Non-Technical Summary

  • ESIA Volume II Main Report

  • ESIA Volume III Environmental & Social Management

  • Stakeholder Engagement Plan

  • Resettlement Action Plan

  • Summary of Material Updates to the ESIA Package

  • ESIA Consultation and Disclosure Report

  • ESIA Volume I Non-Technical Summary

  • Resettlement Action Plan

Key facts

  • Location

    Bash, Bukhara Region, Uzbekistan

  • Offtaker

    JSC National Electric Grid of Uzbekistan (NEGU)

  • Capacity

    500 MW

  • Technology

    Onshore Wind

  • Project cost

    US$ 690 million

  • Acwa share

    65%

  • Offtake contract

    25-year PPA BOO(T)

  • Project company

    FE “ACWA Power Bash Wind” LLC

  • Operations & maintenance company

    NOMAC