Sazagan Solar 1
The Sazagan Solar 1 500 MW PV + 334MW BESS + 220kv 75 km OHTLs project is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW photovoltaic plant including a 334MW battery energy storage system (“BESS”) and 75 km 220kv with double circuit single tower OHTLs . JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Samarkand region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
Key documents
Key facts
-
Location
Nurobod district, Samarkand Region, Uzbekistan
-
Offtaker
JSC National Electric Grid of Uzbekistan (NEGU)
-
Capacity
500 MW PV and 334MW BESS with 75 km OHTLs
-
Technology
Solar PV technology, using bi-facial panels with tracking technology, and battery energy storage system
-
Project cost
US$ 758 million
-
Acwa share
100%
-
Offtake contract
25-year PPA BOO(T)
-
Project company
FE “ACWA Power Sazagan Solar 1” LLC
-
Operations & maintenance company
NOMAC