Sakaka PV IPP

Sakaka PV IPP

Sakaka Solar Photovoltaic Project is the first project within the National Renewable Energy Program, which is considered a strategic step by the Custodian of the Two Holy Mosques to exploit renewable energy sources in line with the Kingdom's Vision 2030.

The Sakaka Solar Energy Project is in Al-Jouf, Saudi Arabia. It is considered one of the leading projects in the field of renewable energy, as it has a production capacity of up to 300 megawatts using single-axis photovoltaic solar panel technology. The total cost of the project is estimated at about 1.2 billion Saudi riyals, and it was developed by establishing a project company, the Sakaka Solar Energy Company, through an alliance that includes ACWA Power with a 70% stake, and Algihaz Holding Company with a 30% stake. The project operates under a power purchase agreement with the Saudi Power Procurement Company for a period of 25 years.

Key documents

  • Environmental & Social Impact Assessment

Key facts

  • Location

    Al Jouf, Saudi Arabia

  • Offtaker

    Saudi Power Procurement Company

  • Capacity

    300 MW

  • Technology

    PV Single Axis Tracker

  • Project cost

    US$ 320 million

  • Commercial operations date

    30 June 2020

  • Acwa share

    70%

  • Offtake contract

    PPA-BOO 25 years

  • Fuel

    Solar Irradiance

  • Other investors

    Saudi NextGen Infra (formerly Al Gihaz)

  • Project company

    Sakaka Solar Energy Company

  • Operations & maintenance company

    Acwa Operations

  • Engineering, procurement & construction company

    Mahindra by Susten & Chint Solar